Structure Fire – Slippery Rock Ln

Box 0709 was struck for a house on fire.  Engine, Tanker and Rescue one responded with 10 personnel.  Wagon 7 arrived to a fully involved structure.  Upon arrival the Engine crew attacked the fire with a 2 1/2″ hand line.  The Tanker crew took a 1 3/4″ hand line to side Charlie to knock down hot spots.  Rescue 1 crew performed initial overhaul operations.  The fire was knocked down in 30 minutes and extensive overhaul was performed.

Units on the assignment: E1, K1, R1, W7, E2, CF7, RE13, K7, B7, K13, E1202, K1209, U7, K505, E505

Permanent link to this article: https://www.warrentonfire.org/structure-fire-slippery-rock-ln/