Sunday, October 12, 20:06 – Box 0216 was struck for a working structure fire. Wagon, Rescue, and Tanker 1 responded with 14 personnel. Units arrived on scene to find an attached garage well involved with extension into the 2nd floor and attic. Wagon and tanker 1 arrived and stretched two 1 3/4 lines for interior fire attack. Units operated for several hours performing fire attack and overhaul.
Units on the assignment: E2, W1, E13, E10, E7, E1209, K1, K7, K10, K13, R2, R1, CF2, AC7, CM2, M14