Warrenton Vol. Fire Co.
Aircraft Crash – Green Meadows Rd
Structure Fire – Redemption Way
September 14, 2011
Attack 1’s construction is progressing well. The tank and pump will be installed in the next two weeks along with the custom bumpers and waterways.
Permanent link to this article: https://www.warrentonfire.org/production-update-attack-1/